Category: Miscellaneous
-

Rebuilding the Safety Net: Detector Safety System v2 Gets Ready for LS3
For more than two decades, the Detectosr Safety System (DSS) has quietly stood guard over ALICE, ATLAS, CMS and LHCb, watching for fire, gas leaks, cooling failures and other hazards, and triggering protective actions on its own, independently of every other control system, whenever something goes wrong. It is one of those systems nobody notices…
-

Testing FCC-ee Reverse Phase Operation in the SPS: compensation of a cavity trip
During the very last weeks of the Super Proton Synchrotron (SPS) operation, the 200 MHz travelling-wave cavities were used to test the Reverse Phase Operation (RPO) mode foreseen for the RF system of the Future Circular Collider (FCC) e+e- collider and booster, as well as different compensation methods in case of an RF cavity trip. Like…
-

All Q2 cryo-assemblies required for the tunnel validated
On Tuesday 1st September, the cold powering test of the eighth and final Q2 cryo-assembly required for HiLumi LHC installation – containing the MQXFB11 (CERN-made quadrupole) and MCBXFB09 (CIEMAT-made corrector) magnets – was completed, including the final 100 K high-voltage test.
-

Inside CAS at IPAC26: Digital growth meets community impact
Inside CAS at IPAC26: Digital growth meets community impact CAS used IPAC26 to connect knowledge, people, and opportunities. With over 1500 atendees, IPAC is a unique opportunity to explore the latest breakthroughs in accelerator research and development. It is also the premier annual gathering for the global accelerator community, bringing together scientists, engineers, and industry professionals from





